Heating or Air Conditioning Permit Fees
The following fees apply to residential heating, cooling, and air conditioning equipment, effective January 1, 2005.
| Residential Air Handling Unit |
$36.00 |
| Residential Central Air/Heat Pump |
$36.00 |
Residential Duct Work Addition: Per heat run or register Minimum Fee |
$3.50 $28.00 |
Residential Gas Appliance (Fireplace, Gas Log Insert, Range, Clothes Dryer, Outdoor Grill, Lamps, Water Heater, etc.) per appliance |
$33.00 |
Residential Heating Appliance: Initial 200,000 BTU input Additional 200,000 BTU input Maximum fee per unit |
$36.00 $18.00 $126.00 |
Residential Hot Water Piping Addition: Per heat run or register Minimum Fee |
$3.50 $28.00 |
| Solid Fuel-Burning Space-Heating Stove (Wood or Coal) |
$33.00 |
Other inspections and fees:
|
|
1. Inspections outside of normal business hours (minimum charge - two hours)
|
$60.00 per hour*
|
|
2. Reinspection fees assessed under Sections 108 and 109 of the International Building Code
|
$60.00 per hour*
|
|
3. Inspections for which no fee is specifically indicated (minimum charge: one half hour)
|
$60.00 per hour*
|
|
4. Additional plan review required by changes, additions, or revisions to plans (minimum charge:one half hour)
|
$60.00 per hour*
|
|
5. Use of outside consultants for plan checking, inspections, or both.
|
Actual Cost**
|
* Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
** Actual costs include administrative and overhead cost.